Buying off-plan lets you choose your home early and pay in stages. These are the points to check before you commit.
1. The developer
Look at completed projects, not only renderings. Visit homes the developer has already handed over and ask how long construction took. A developer who handles architecture, engineering and construction in-house has more control over quality and timing.
2. Land and permits
Your lawyer should confirm who owns the land, that there are no charges on it, and that the project has the necessary planning and building permits.
3. The contract
- Exact unit, plot and floor areas, with the plans attached.
- The specification: materials, finishes, kitchen, bathrooms, pool and landscaping.
- Delivery date and what happens if it is delayed.
- How and when the individual title deed will be issued.
4. The payment plan
Stage payments should be linked to construction milestones. Check what is included in the price — VAT, the electricity transformer contribution, parking — and what is extra.
5. Registration
Make sure the contract is registered at the Land Registry within 21 days of signing and that your Permission to Purchase application is started on time.
6. Visualisations versus reality
Renderings show the design intent. Ask for the plans, sections and material samples, and visit the site during construction.